434 Oakridge Drive Port Saint Lucie, FL 34984

4 Beds
2 Baths
1,806 Sqft
10,000 Sqft lot
0.23 Acre lot
Status: Active
Property Type: Single Family Detached
Year Built: 2024
Neighborhood: Port St Lucie Section 18
Days on Website: 1

Courtesy of Holiday Builders of the Gulf C

Description

VALUE SERIES Homes, the SYLVESTER. Known for being a quality build, this CBS constructed home includes our energy smart features throughout with digital thermostat, 14 SEER rated heating, ventilation & A/C system, roof vent and soffit for attic vent, and dual pane energy efficient windows. This home comes with a one-year non-transferable builder warranty, a two-year non-transferable mechanical warranty and a transferable 10-year Maverick Warranties and Insurance limited structural warranty. No reason to rent a home when you can own. Standard selections of laminate countertops, vinyl flooring with carpet in bedrooms and living areas are pre-selected, keeping buyers' savings in mind.

Open House

Property Details and Features

  • Source: Palm Beach
  • Listing date: 2024-11-21
  • REO: No
  • Short sale?: No
  • $245 per square foot
  • Dishwasher
  • Microwave
  • Range - Electric
  • Storm Shutters
  • 2 total bathrooms
  • 2 full bathrooms
  • 4 bedrooms
  • 1,806 total living square feet
  • 2,417 total square feet
  • Built in 2024
  • Year built description: New Construction
  • Square footage source: Floor Plan
  • Model name: Sylvester
  • CBS
  • Concrete
  • Stucco
  • Traditional
  • Attic
  • Laundry-Util/Closet
  • Central
  • Electric
  • Dining-Living
  • Carpet
  • Vinyl Floor
  • 3 garage spaces
  • Central
  • Electric
  • Homeowners association: None
  • Unfurnished
  • Foyer
  • Pantry
  • County: St. Lucie
  • Subdivision: PORT ST LUCIE SECTION 18
  • 10,000 lot square feet
  • < 1/4 Acre
  • 1/4 to 1/2 Acre
  • Paved Road
  • Public Road
  • Separate Shower
  • Business name: Yes
  • 2+ Spaces
  • Garage - Attached
  • Zoning: RS-2PS
  • Waterfront: No
  • None
  • Comp Shingle
  • Taxes: $1,033
  • Tax year: 2024
  • New Construction
  • Electric
  • Public Sewer
  • Public Water